Sign In | Join Free | My gimpguru.org |
|
Brand Name : OEM
Model Number : geotube
Certification : ISO,SGS
Place of Origin : China
MOQ : 1PCS
Price : negotiation
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 600000 Piece/Pieces per Month
Delivery Time : 5-8 days
Packaging Details : Customer Demand
Type : Woven Geotextiles
Product Name : Woven Geotube
Product Material : Polypropylene
Structure : Fabric Form
Function : Filtration ,Separation,Drainage, Reinforcement
SIze : 17.5cm*9.5cm*0.5cm
Project Solution Capability : Total Solution for Projects
Weight : 100-1000g/sqm
Product Width : Customized
HS Code : 5407730000
OEM Mine Sludge Dewatering Geotextile Tube Sand Bag Geo Container Geotube for Breakwater Embankment Cofferdam Jetty Riverbank
Product Description
Production:
1.Geotextile Tube is manufactured from woven high tenacity polypropylene multifilament yarns, which are woven into a stable network such that the yarns retain their relative position.
2.It is inert to biological degradation and resistant to naturally encountered chemicals, alkalis and acids, etc.
3.Geotextile tube has different strength and permeability, and have high UV resistance, seawater resistance, microbial erosion resistance and other durability.
Item | Unit | Testing Standard | Technical Parameters | ||
GT70X95B | GT70X95 | ||||
Breaking strength | MD | KN/m | ISO 10319-2015 | 85 | 85 |
CD | KN/m | ISO 10319-2015 | 105 | 115 | |
Elongation of break | MD | % | ISO 10319-2015 | 13 | 13 |
CD | % | ISO 10319-2015 | 8 | 8 | |
Sewing Tensile Strength | KN/m | ISO 10321-2008 | 70 | 90 | |
Static Bursting Strength(CBR) | KN | GB/T 14800-2010 | 8 | 9 | |
Equivalent hole size(O90) | mm | GB/T 14799-2005 | 0.5 | 0.45 | |
Permeability(Q50) | L/m2/s | GB/T 15789-2005 | 50 | 35 | |
UV-resistance (500 Hours strength retention) | % | ASTMD4355-2014 | 90 | 90 |
This knowledge technology have a three-step process:
Step 1: Filling -- Sludge (dredged material) is pumped into the Geotube container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The TenCate Geotube?container's unique fabric confines the fine grains of the material.
Step 2: Dewatering -- Clear effluent water simply drains from the Geotube container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. And this volume reduction allows for the repeated filling of the Geotube container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.
Step 3: Consolidation -- After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the Geotube container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.
FAQ
Q: Can you send samples?
![]() |
Breakwater Embankment Cofferdam Geotextile Geotube Dewatering Bags Geo Container Images |